|
|

Landfill Closure / Environmental Instrumentation
 |
Client:
Confidential public agency
Location:
Western WA
Contact
us for more information. |
Project Background & Challenges
A public agency client required support in designing an effective
landfill cover system to control infiltration of rainwater at a rural western
Washington facility. The client wanted to integrate an innovative phytocap
design, which would limit the quantity of leachate generation, as well as
comply with regulatory closure standards.
Solution
Aspect provided technical support in the implementation of
a poplar tree phytocap cover on the closed landfill as a water management
tool. The cover consists of four species of hybrid poplars planted into the
existing soils covering municipal solid waste. Approximately 10,000 poplar
seedlings were planted in April 2000. Because of their vigorous root systems,
poplars utilize soil moisture to depths much greater than grasses, creating
a reservoir for moisture during the dormant winter months. To evaluate the
success of the project, we designed and operate a monitoring system for the
cover which includes continuous soil moisture measurement using time domain
reflectometry (TDR) probes, precipitation, runoff, climate parameters necessary
for computation of evapotranspiration, and canopy interception.
|