Case Study: Groundwater Confirmation Monitoring Program
 |
Client:
Port of Seattle
Location:
King County (Seattle), WA
Contact for environmental projects: Doug Hillman |
Project Background & Challenges
The Port of Seattle must demonstrate that the remedial
measures implemented at the Terminal 5 facility meet the cleanup objectives
of the Southwest Harbor Redevelopment Program. These objectives include
protecting adjoining marine waters.
Solution
Aspect implemented a 5-year monitoring program to characterize
the post-remediation groundwater flow regime. The program, designed to
meet closure requirements under MTCA, includes a detailed tidal study
and water quality characterization. The tidal study entails evaluating
the effects of site-capping and stormwater improvements on local aquifers.
The water quality characterization evaluates the effects of redevelopment
and remedial alternatives on groundwater and surface water geochemistry.
|